πŸ“‹ Case Study

Mountain Resort RSRW for Road Realignment

Steep 45Β° natural slope with variable glacial till requiring rapid, low-impact construction

πŸ—οΈ Project Overview

Ski resort access road realignment, Colorado Rockies

🎯 Challenge

Steep 45Β° natural slope with variable glacial till requiring rapid, low-impact construction

πŸ”§ Design Approach

Mechanically stabilized earth (MSE) wall using galvanized steel strip reinforcement and modular concrete facing

πŸ“ Design Diagram

H = 10 mL β‰₯ 10.4 mFacing width45Β° slope
Glacial tillMSE Wall: Galvanized steel strips +modular concrete facingFacing Connection Moment: M = 12.8 kNΒ·m/mStability zone

AI-generated project design illustration

πŸ“ Key Calculations

Reinforcement Length (L)

L β‰₯ 0.7Β·H + (0.3Β·HΒ·K_aΒ·tanΟ†)
Result: 10.4 m
Ensured pullout safety factor > 1.5

Facing Connection Moment

M = wΒ·sΒ²/8
Result: 12.8 kNΒ·m/m
Governed facing panel thickness selection

πŸ“Š Results

Built in 22 days during narrow summer window; zero post-construction settlement or face deflection

πŸ’‘ Lessons Learned

  • β€’Strip reinforcement orientation must follow principal stress direction
  • β€’Facing panel joints require compressible filler to accommodate thermal expansion

βœ… Key Takeaways

  • 1Strip reinforcement orientation must follow principal stress direction
  • 2Facing panel joints require compressible filler to accommodate thermal expansion