๐Ÿ“‹ Case Study

Urban Transit Station Gravity Wall Construction

Limited right-of-way requiring 6.2 m tall wall with adjacent historic building (1.2 m clearance)

๐Ÿ—๏ธ Project Overview

Downtown light rail station, Portland, OR

๐ŸŽฏ Challenge

Limited right-of-way requiring 6.2 m tall wall with adjacent historic building (1.2 m clearance)

๐Ÿ”ง Design Approach

Segmental precast concrete gravity wall with stepped footing and load-spreading granular fill

๐Ÿ“ Design Diagram

Ground Surface Historic Building 1.2 m clearance Segmental Precast Gravity Wall Stepped Footing Granular Fill 6.2 m qmax = 192 kPa S = 8.3 mm Load Path Urban Transit Station Gravity Wall Gravity Wall & Footing Granular Fill Historic Building

AI-generated project design illustration

๐Ÿ“ Key Calculations

Bearing Pressure Redistribution

q_max = (P/A) + (6ยทM)/(Bยฒ)
Result: 192 kPa
Below allowable 200 kPa despite eccentricity

Settlement Prediction

S = C_c/(1+eโ‚€)ยทHยทlog(ฯƒ'โ‚š/ฯƒ'โ‚€)
Result: 8.3 mm
Within tolerance for adjacent masonry

๐Ÿ“Š Results

Completed in 11 weeks with zero vibration impact on heritage structure; certified by third-party structural monitor

๐Ÿ’ก Lessons Learned

  • โ€ขPrecast modularity enables tight urban sequencing
  • โ€ขGranular fill compaction must exceed 95% Proctor to prevent differential settlement

โœ… Key Takeaways

  • 1Precast modularity enables tight urban sequencing
  • 2Granular fill compaction must exceed 95% Proctor to prevent differential settlement